Power-up controller

Mandatory   Easy   3 min  

For more information about robot booting, refer to (2.12-en_US) Connecting External Device – DART Platform

Press the power switch at the bottom of the controller. The system is powered up including robot, controller and smart pendant.

image2022-10-27_20-50-46.png

Note

LED position of E-series robot is as follows

image2022-11-3_17-35-48.png