Test controller and flange I/O

Mandatory   Normal   10 min  

Dart-Plaform features a function capable of testing the operation of the tool connected to the flange I/O.

image2022-11-3_17-58-39.png

The following tests can be performed through Status > I/O Overview or I/O Test of Dart-Plaform screen. For more information, refer to each item.