|
No. |
Item |
Description |
|
1 |
Current Task |
Displays the task currently being edited or executed. |
|
2 |
Save Task |
If changes are made to the task being edited, they must be saved in order to test the I/O device. |
|
3 |
Port Number |
It displays the port number used for testing the I/O device, and it is displayed when the signal is on. |
|
4 |
Port Name |
The port name of the I/O device for testing can be designated. |
|
5 |
I/O Test |
A signal can be sent to the corresponding port. |
|
6 |
Initialization |
Initializes all signals of the device as off. |